Abnormally low tender
A tender is a submission made by a prospective supplier in response to an invitation to tender (ITT). It makes an offer for the supply of goods or services.
A tender which is a potentially abnormally low tender is one which is less than the estimated value by a margin which requires explanation. In particular, any tender that:
- Is more than 15% lower than the adjusted average price; and
- Exceeds the proximity margin, that is more than 1% lower than the lowest qualifying price.
Potentially abnormally low tenders should be excluded unless the tenderer satisfactorily explains the aspects that appear abnormally low.
NB The adjusted average price is the average of all the tender prices provided excluding the highest tender price.
The proximity margin shall be limited to a minimum value of £1,000 and a maximum value of £100,000.
Ref Guidance for public sector contracting authorities on the procurement of construction works, published by the Scottish Procurement and Property Directorate on 21 Dec 2018.
[edit] Related articles on Designing Buildings
- Competitive tender.
- Cut-throat competition.
- Due diligence when selecting contractors or subcontractors.
- Preferred tenderer.
- Procurement route.
- Tender evaluation.
- Tender processes.
- Two stage tender.
- Invitation to tender.
- OJEU procurement rules.
- Suicide bidding.
- Tender documentation.
- Tender price appraisal.
- Tender return slip.
- Tender settlement meeting.
- Variant bid.
Featured articles and news
HBPT and BEAMS Jubilees. Book review.
Does the first Labour budget deliver for the built environment?
What does the UK Budget mean for electrical contractors?
Mixed response as business pays, are there silver linings?
A brownfield housing boost for Liverpool
A 56 million investment from Homes England now approved.
Fostering a future-ready workforce through collaboration
Collaborative Futures: Competence, Capability and Capacity, published and available for download.
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.